A full revision audit from one question
The agent checks every work instruction against every engineering change and lists the equipment running outdated procedures.
The problem
Why this work is slow today.
Production runs on documented work instructions. When an engineering change lands, every instruction it touches has to follow. In practice some do not, and the gap shows up in an audit or after an incident.
In the demo
What you see, step by step.
Ask what the floor would ask
Which equipment has outdated work instructions?
The agent reads the whole set
Fourteen files: operating procedures, work instructions, engineering change notices, and the revision control policy.
Every revision is checked
The agent finds machines running superseded startup instructions and a safety-critical press whose instruction predates a control change.
The report goes out
The analysis becomes a formatted report and reaches the people who must act on it.
The result
What changes for your team.
The demo ends with a specific list: which stations, which instruction, which change notice, and which date. A revision audit that took days becomes a question anyone on the floor can ask.
Who it fits
Quality and document control
Teams that own procedures and revision control.
Manufacturing engineering
Engineers who issue change notices.
EHS leaders
Managers responsible for safety-critical instructions.
Transcript
The narration, in full.
Production runs on documented work instructions. When an engineering change lands, every instruction it touches has to follow it. This is the Production Knowledge and SOP Assistant. 4 nodes behind a single question. The question is the kind anyone on the floor would ask. Which equipment has outdated work instructions? The SuperAgent reads the whole document set, 14 files: standard operating procedures, work instructions, engineering change notices, and the revision control policy.
It checks every revision against every change notice. 3 CNC machines are still running superseded startup instructions. Their work instructions cite SOP-025, revision 2. Revision 3 was required by the 15th of September. A hydraulic press is safety-critical. Its instruction predates the change from 2-hand controls to a light curtain.
7 more stations are overdue, each tied to a named change notice and a date. The analysis is written straight into a formatted report. Filename, font, margins, and page breaks are all set in the node, and the report goes to the people who have to act on it. One question, 14 documents. A full revision audit in minutes.
This demo is produced by ICS Nett and shows FinBlade AI running on sample data. Company names, people, and figures are illustrative. Your deployment runs on your own data, inside your own boundary.
Keep watching
Related demos.
1:24
ManufacturingTen sources, one supplier rankingOne question reads five registers and five reports at once and names the suppliers with the lowest quality ratings.
1:30
ManufacturingFrom inspection record to non-conformance reportThe agent lists rejected lots, routes each inspection, builds the report, and notifies production.
1:25
Industrial safetyWho is cleared to work, with the evidenceTraining, permits, and medical certificates are checked together. The answer is dated, and the right report goes out.
Your AI. Your data. Your control.
Want this on your own data?
Start with a free call with Thomas. We map the work, the data rules, and the right deployment path.
Free. Direct. No pitch deck. Rooted in Middle Tennessee, serving organizations nationwide.